{"id":2153,"date":"2013-10-04T13:44:38","date_gmt":"2013-10-04T17:44:38","guid":{"rendered":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=2153"},"modified":"2013-10-04T13:44:38","modified_gmt":"2013-10-04T17:44:38","slug":"devis-et-ingenierie-de-la-valeur-2","status":"publish","type":"post","link":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=2153","title":{"rendered":"Devis et ing\u00e9nierie de la valeur"},"content":{"rendered":"<h2>Les devis seront utilis\u00e9s tout au long du processus de conception et de construction.<\/h2>\n<p>Pendant la planification du projet, ces devis sont calcul\u00e9s \u00e0 l\u2019aide donn\u00e9es de projets comparables, habituellement selon la surface de chaque type d\u2019espace (d\u2019o\u00f9 l\u2019importance d\u2019un bon programme de construction). Ces estimations pr\u00e9liminaires comporteront n\u00e9cessairement un <b>haut degr\u00e9 d\u2019incertitude<\/b>, souvent +- 10\u00a0% ou plus, couvert par une r\u00e9serve pour \u00e9ventualit\u00e9s dans le budget du projet. \u00c0 mesure que la conception se poursuit et que davantage de renseignements sont disponibles au sujet de l\u2019\u00e9difice planifi\u00e9, les estimations de prix deviendront de plus en plus pr\u00e9cises, et les pourcentages des fonds de pr\u00e9voyance seront r\u00e9duits.<\/p>\n<h2>L\u2019ing\u00e9nierie de la valeur peut \u00eatre un moyen d\u2019am\u00e9liorer le rapport co\u00fbt-efficacit\u00e9<\/h2>\n<p>P\u00e9riodiquement au cours de la phase de conception, des exercices de d\u00e9termination des co\u00fbts, appel\u00e9e Ing\u00e9nierie de la valeur (IV), seront effectu\u00e9s. L\u2019IV est cens\u00e9e assurer que le design aura le <b>meilleur rapport co\u00fbt-efficacit\u00e9 possible<\/b>, pour un m\u00eame niveau de qualit\u00e9 et de performance. Elle peut souvent constituer un exercice utile impliquant le client, l\u2019\u00e9quipe d\u2019architectes et, fr\u00e9quemment, les entrepreneurs, qui <b>travaillent ensemble pour trouver des ajustements rentables<\/b> au design et aux sp\u00e9cifications.<\/p>\n<p>Toutefois, de nombreux architectes vous diront que l\u2019IV a souvent pour r\u00e9sultat de \u00ab\u00a0sortir la valeur d\u2019un projet\u00a0\u00bb. L\u2019IV ne peut rectifier une \u00ab\u00a0d\u00e9rive des objectifs\u00a0\u00bb (croissance non planifi\u00e9e de l\u2019envergure d\u2019un projet) ni corriger des devis ant\u00e9rieurs inexacts (par opposition \u00e0 impr\u00e9cis).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Les devis seront utilis\u00e9s tout au long du processus de conception et de construction. Pendant la planification du projet, ces devis sont calcul\u00e9s \u00e0 l\u2019aide donn\u00e9es de projets comparables, habituellement selon la surface de chaque type d\u2019espace (d\u2019o\u00f9 l\u2019importance d\u2019un bon programme de construction). Ces estimations pr\u00e9liminaires comporteront n\u00e9cessairement un haut degr\u00e9 d\u2019incertitude, souvent +- [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[136,137,139],"tags":[],"class_list":["post-2153","post","type-post","status-publish","format-standard","hentry","category-agrandissements","category-construction-agrandissements","category-preconstruction-construction-agrandissements"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/2153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2153"}],"version-history":[{"count":2,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/2153\/revisions"}],"predecessor-version":[{"id":2580,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/2153\/revisions\/2580"}],"wp:attachment":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}