{"id":2159,"date":"2013-10-04T13:52:29","date_gmt":"2013-10-04T17:52:29","guid":{"rendered":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=2159"},"modified":"2013-10-04T13:52:29","modified_gmt":"2013-10-04T17:52:29","slug":"gc-a-risque-2","status":"publish","type":"post","link":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=2159","title":{"rendered":"GC \u00e0 risque"},"content":{"rendered":"<p>Avec la m\u00e9thode d\u2019ex\u00e9cution appel\u00e9e Gestion de la construction \u00e0 risque, un gestionnaire de construction (GC) est choisi en fonction de ses <b>qualifications<\/b> (et non pas en fonction de la soumission la plus basse, comme dans la formule Conception-Soumission-Construction) et il est invit\u00e9 \u00e0 participer aux \u00e9tapes finales du processus de conception. Le GC donne son avis quant \u00e0 la constructibilit\u00e9, aux co\u00fbts et au calendrier pendant la phase finale du design, et il garantit souvent l\u2019ach\u00e8vement des travaux pour un <b>prix maximum garanti n\u00e9goci\u00e9 avant que la conception soit termin\u00e9e \u00e0 100\u00a0%<\/b> (PMG). Par cons\u00e9quent, le GC est \u00ab\u00a0\u00e0 risque\u00a0\u00bb si le projet ne peut \u00eatre achev\u00e9 pour moins que le PMG.<\/p>\n<p>Cet arrangement signifie que <b>la construction peut commencer<\/b> avant l\u2019ach\u00e8vement de chaque \u00e9l\u00e9ment de la conception, et que le design n\u2019a pas n\u00e9cessairement besoin d\u2019\u00eatre document\u00e9 de mani\u00e8re aussi sp\u00e9cifique que dans un contrat Conception-Soumission-Construction. Le PMG vous permet aussi de continuer \u00e0 collecter des fonds avec un co\u00fbt total garanti, et il peut simplifier la facturation et la comptabilit\u00e9.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Avec la m\u00e9thode d\u2019ex\u00e9cution appel\u00e9e Gestion de la construction \u00e0 risque, un gestionnaire de construction (GC) est choisi en fonction de ses qualifications (et non pas en fonction de la soumission la plus basse, comme dans la formule Conception-Soumission-Construction) et il est invit\u00e9 \u00e0 participer aux \u00e9tapes finales du processus de conception. Le GC donne [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[136,140,141],"tags":[],"class_list":["post-2159","post","type-post","status-publish","format-standard","hentry","category-agrandissements","category-conception-agrandissements","category-methodes-execution-projets-formation-equipe-etapes-conception-conception-agrandissements"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/2159","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2159"}],"version-history":[{"count":2,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/2159\/revisions"}],"predecessor-version":[{"id":2576,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/2159\/revisions\/2576"}],"wp:attachment":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2159"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2159"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}