{"id":364,"date":"2013-01-09T17:17:59","date_gmt":"2013-01-09T22:17:59","guid":{"rendered":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=364"},"modified":"2017-04-21T14:43:17","modified_gmt":"2017-04-21T18:43:17","slug":"phases-of-design","status":"publish","type":"post","link":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=364","title":{"rendered":"Phases of Design"},"content":{"rendered":"<h2>Almost all building projects go through a similar design process.<\/h2>\n<p>Initially, design ideas are tested and developed, and as design continues in a series of phases, more and more detail is added. The phases of work divide the work into manageable chunks; at the end of each phase client approval is required before moving forward.\u00a0 The <b>five typical phases<\/b> are:<\/p>\n<ul>\n<li><span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=730\" target=\"_blank\">Predesign<\/a><\/span>\u00a0(almost never abbreviated to PD, in contrast with the other phases)<\/li>\n<li><span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=732\" target=\"_blank\">Schematic Design<\/a><\/span>\u00a0(SD)<\/li>\n<li><span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=734\" target=\"_blank\">Design Development<\/a><\/span>\u00a0(DD)<\/li>\n<li><span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=736\" target=\"_blank\">Construction Documents<\/a><\/span>\u00a0(CDs)<\/li>\n<li><span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=738\" target=\"_blank\">Construction Administration<\/a><\/span>\u00a0(CA)<\/li>\n<\/ul>\n<h2>Big decisions happen early<\/h2>\n<p>In the beginning, it is easy and inexpensive to make <b>significant design changes<\/b> in order to arrive at the <b>right solution<\/b>.\u00a0 With each phase of design, more detail is added, so as the phases go on, it becomes more difficult and costly to make changes.<\/p>\n<p>Because most arts and cultural facilities are <b>very complex projects<\/b> for which the clients have specialized needs, it\u2019s important to <b>stay involved<\/b> and aware throughout the design process.<b><\/b><\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/www.artsbuildontario.ca\/pibi\/wp-content\/uploads\/sites\/3\/2013\/07\/PiBi-Chart-Phases-of-Design.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1203 aligncenter\" alt=\"PiBi Chart - Phases of Design\" src=\"https:\/\/www.artsbuildontario.ca\/pibi\/wp-content\/uploads\/sites\/3\/2013\/07\/PiBi-Chart-Phases-of-Design.jpg\" width=\"444\" height=\"235\" \/><\/a><\/p>\n<p style=\"text-align: center;\">(<a href=\"http:\/\/www.fs.fed.us\/t-d\/pubs\/htmlpubs\/htm09732802\/longdesc\/fig05ld.htm\">http:\/\/www.fs.fed.us\/t-d\/pubs\/htmlpubs\/htm09732802\/longdesc\/fig05ld.htm<\/a>)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Almost all building projects go through a similar design process. Initially, design ideas are tested and developed, and as design continues in a series of phases, more and more detail is added. The phases of work divide the work into manageable chunks; at the end of each phase client approval is required before moving forward.\u00a0 [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[75,10,76],"tags":[],"class_list":["post-364","post","type-post","status-publish","format-standard","hentry","category-design","category-new-con","category-phases-of-design"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/364","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=364"}],"version-history":[{"count":11,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/364\/revisions"}],"predecessor-version":[{"id":2494,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/364\/revisions\/2494"}],"wp:attachment":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=364"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=364"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=364"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}