{"id":375,"date":"2013-01-05T17:23:41","date_gmt":"2013-01-05T22:23:41","guid":{"rendered":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=375"},"modified":"2017-04-21T14:43:21","modified_gmt":"2017-04-21T18:43:21","slug":"pre-construction","status":"publish","type":"post","link":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=375","title":{"rendered":"Pre-Construction"},"content":{"rendered":"<p>As the design phase draws to a close and you prepare to begin construction, a few key topics warrant special attention from the owner:<\/p>\n<ul>\n<li>Construction <b><span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=750\" target=\"_blank\">cost estimates and value engineering<\/a><\/span><\/b><\/li>\n<li><b><span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=754\" target=\"_blank\">Beginning construction<\/a><\/span><\/b><\/li>\n<li>Construction\u2019s <b><span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=752\" target=\"_blank\">effect on operations<\/a><\/span><\/b><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>As the design phase draws to a close and you prepare to begin construction, a few key topics warrant special attention from the owner: Construction cost estimates and value engineering Beginning construction Construction\u2019s effect on operations<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,79,80],"tags":[],"class_list":["post-375","post","type-post","status-publish","format-standard","hentry","category-new-con","category-phase-4-construction","category-pre-construction"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/375","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=375"}],"version-history":[{"count":10,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/375\/revisions"}],"predecessor-version":[{"id":1720,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/375\/revisions\/1720"}],"wp:attachment":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=375"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=375"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}