{"id":633,"date":"2013-08-10T17:11:42","date_gmt":"2013-08-10T21:11:42","guid":{"rendered":"https:\/\/www.artsbuildontario.ca\/pibi\/2013\/01\/11\/project-financing-4\/"},"modified":"2017-04-21T14:43:13","modified_gmt":"2017-04-21T18:43:13","slug":"project-management","status":"publish","type":"post","link":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=633","title":{"rendered":"Project Management"},"content":{"rendered":"<p>The process of planning and executing a <b>major maintenance project<\/b> has a lot in common with new construction projects.\u00a0 The phases of work, characters involved, and key considerations are similar, just executed on a shorter timeframe and with (hopefully) much less disruption to existing operations.<\/p>\n<p>The scale of the maintenance project will determine what level of detail is required for each step, and usually will not require an extensive concept and feasibility process.<\/p>\n<p>However, major maintenance often requires some targeted fundraising, oversight of a (short) design and specification process, and will certainly have impacts to your existing facilities during construction.<\/p>\n<p><a href=\"https:\/\/www.artsbuildontario.ca\/pibi\/wp-content\/uploads\/sites\/3\/2013\/08\/OPScircle.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-1955\" style=\"border: 0px;\" src=\"https:\/\/www.artsbuildontario.ca\/pibi\/wp-content\/uploads\/sites\/3\/2013\/08\/OPScircle.jpg\" alt=\"OPScircle\" width=\"41\" height=\"41\" srcset=\"https:\/\/www.artsbuildontario.ca\/pibi\/wp-content\/uploads\/sites\/3\/2013\/08\/OPScircle.jpg 41w, https:\/\/www.artsbuildontario.ca\/pibi\/wp-content\/uploads\/sites\/3\/2013\/08\/OPScircle-150x150.jpg 150w, https:\/\/www.artsbuildontario.ca\/pibi\/wp-content\/uploads\/sites\/3\/2013\/08\/OPScircle-300x300.jpg 300w, https:\/\/www.artsbuildontario.ca\/pibi\/wp-content\/uploads\/sites\/3\/2013\/08\/OPScircle-1024x1024.jpg 1024w\" sizes=\"auto, (max-width: 41px) 100vw, 41px\" \/><\/a>If you are contemplating a <b>large major maintenance<\/b> project, it\u2019s worth having a click through the New Construction part of <b>Plan It | Build It<\/b> to familiarize yourself with the process, especially these sections:<\/p>\n<ul>\n<li><span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=362\" target=\"_blank\">Assembling a Team<\/a><\/span><\/li>\n<li><span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=750\" target=\"_blank\">Cost Estimates and Value Engineering<\/a><\/span><\/li>\n<li><span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=752\" target=\"_blank\">Effects on Operations<\/a><\/span><\/li>\n<li><span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=754\" target=\"_blank\">Client\u2019s Role during Construction<\/a><\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The process of planning and executing a major maintenance project has a lot in common with new construction projects.\u00a0 The phases of work, characters involved, and key considerations are similar, just executed on a shorter timeframe and with (hopefully) much less disruption to existing operations. The scale of the maintenance project will determine what level [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[99,6,120],"tags":[],"class_list":["post-633","post","type-post","status-publish","format-standard","hentry","category-major-maintenance-projects-ops-maintenance","category-operations-maintenance","category-proj-management-major-maintenance-proj-ops-maintenance"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/633","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=633"}],"version-history":[{"count":10,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/633\/revisions"}],"predecessor-version":[{"id":2787,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/633\/revisions\/2787"}],"wp:attachment":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=633"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=633"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=633"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}