{"id":712,"date":"2013-01-18T02:03:57","date_gmt":"2013-01-18T07:03:57","guid":{"rendered":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=712"},"modified":"2017-04-21T14:43:14","modified_gmt":"2017-04-21T18:43:14","slug":"solution-options","status":"publish","type":"post","link":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=712","title":{"rendered":"Solution Options"},"content":{"rendered":"<h2>Identifying the requirements for a facility that meets your needs<\/h2>\n<p>Once you have articulated your project mission and detailed the needs you are trying to meet, it\u2019s time to begin to think about different solutions that effectively meet these needs (<b>the means<\/b>). The <b>objective<\/b> of this work is to identify <b>scenarios to test<\/b> during feasibility.<\/p>\n<h2>Solution options can include:<\/h2>\n<ul>\n<li><b>Space lists<\/b> (preliminary building program) and functional descriptions<\/li>\n<li>A notion of <b>how spaces will be used<\/b>, and by whom<\/li>\n<li>Utilization calendar outlining the <b>use of spaces over time<\/b> (if required)<\/li>\n<\/ul>\n<p>Consultants can help develop solutions options to the point where they can form the basis of an <span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=718\" target=\"_blank\">architectural feasibility analysis<\/a><\/span>.<\/p>\n<h2>N.B. It\u2019s not (yet) time to design the building<\/h2>\n<p>Resist the urge to develop<b> design ideas<\/b> at this point.\u00a0 Becoming attached to a design idea too early on will <b>hinder the development<\/b> of <b>effective solutions<\/b> to the project\u2019s needs.\u00a0 Towards the end of the <span style=\"text-decoration: underline;\"><a href=\"\/pibi\/?p=344\" target=\"_blank\">Feasibility Assessment<\/a><\/span>\u00a0phase, there will be opportunities to begin to think about architectural design.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Identifying the requirements for a facility that meets your needs Once you have articulated your project mission and detailed the needs you are trying to meet, it\u2019s time to begin to think about different solutions that effectively meet these needs (the means). The objective of this work is to identify scenarios to test during feasibility. [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[67,10,70],"tags":[],"class_list":["post-712","post","type-post","status-publish","format-standard","hentry","category-concept-feasibility","category-new-con","category-project-concept"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/712","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=712"}],"version-history":[{"count":10,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/712\/revisions"}],"predecessor-version":[{"id":2465,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/712\/revisions\/2465"}],"wp:attachment":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=712"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=712"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}