{"id":730,"date":"2013-01-09T05:08:27","date_gmt":"2013-01-09T10:08:27","guid":{"rendered":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=730"},"modified":"2017-04-21T14:43:18","modified_gmt":"2017-04-21T18:43:18","slug":"predesign","status":"publish","type":"post","link":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=730","title":{"rendered":"Predesign"},"content":{"rendered":"<p>In Predesign, the <b>key design parameters<\/b> of the project are worked out, so they are known before beginning design in earnest.<\/p>\n<h2>These include:<\/h2>\n<ul>\n<li>site selection<\/li>\n<li>program confirmation<\/li>\n<li>preliminary project cost estimates<\/li>\n<li>scope and schedule analyses<\/li>\n<\/ul>\n<p>Some projects may have completed aspects of Predesign during the development of a project concept; in this case the Predesign phase is an opportunity to <b>confirm<\/b> <b>those findings<\/b> and develop them with the <b>selected design team<\/b>.<\/p>\n<p>Sometimes, but not always, preliminary ideas about <b>how a building will look<\/b> are sketched out during Predesign.\u00a0 Small projects may skip the Predesign phase entirely and go directly to Schematic Design, but most projects will benefit from at least a short Predesign phase to confirm the building program and other design drivers. \u00a0A well-executed Predesign package that explains the key parameters of a design can be a useful tool for early fundraising and developing government support for a project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In Predesign, the key design parameters of the project are worked out, so they are known before beginning design in earnest. These include: site selection program confirmation preliminary project cost estimates scope and schedule analyses Some projects may have completed aspects of Predesign during the development of a project concept; in this case the Predesign [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[75,10,76],"tags":[],"class_list":["post-730","post","type-post","status-publish","format-standard","hentry","category-design","category-new-con","category-phases-of-design"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/730","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=730"}],"version-history":[{"count":7,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/730\/revisions"}],"predecessor-version":[{"id":1975,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/730\/revisions\/1975"}],"wp:attachment":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=730"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=730"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=730"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}