{"id":742,"date":"2013-01-08T02:12:26","date_gmt":"2013-01-08T07:12:26","guid":{"rendered":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=742"},"modified":"2017-04-21T14:43:20","modified_gmt":"2017-04-21T18:43:20","slug":"rfps-selection","status":"publish","type":"post","link":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=742","title":{"rendered":"RFPs, RFQs &#038; Selection"},"content":{"rendered":"<p><strong>Now that you know all the characters, the next step is to find some that you like.<\/strong><\/p>\n<p>This process ordinarily begins with <b>issuing an RFP<\/b> or a Request for Proposals either publicly or to a list of firms selected by project leadership.\u00a0 Usually you will issue a separate RFP and selection process for each member of the design team with whom you will be contracted directly.\u00a0 For example, you would issue an RFP for a project manager or an architect, but not for a structural or mechanical engineer \u2013 those specialists will be on the architect\u2019s team.<\/p>\n<h2>The RFP should clearly describe:<\/h2>\n<ul>\n<li>The project concept<\/li>\n<li>The scope of the work you wish the respondent to undertake<\/li>\n<li>The selection criteria you plan to use<\/li>\n<li>A timeline for the selection and interview process<\/li>\n<\/ul>\n<p>Respondents to the RFP will submit their <b>qualifications<\/b>, often (in the case of architectural teams) listing sub-consultants with special expertise or qualifications as well.\u00a0 They will describe other <b>similar projects<\/b> they\u2019ve completed, and list <b>clients<\/b> they\u2019ve worked with.\u00a0 They\u2019ll also propose a project scope description and fee for their work. You will then select a short list of firms \u2013 usually 3 or so \u2013 from the respondents to interview, and then make a selection.<\/p>\n<h2>Sometimes. . . .<\/h2>\n<p>Large projects often begin the design team selection process by issuing an RFQ, or a <b>Request for Qualifications<\/b>, in order to narrow down the pool of firms being considered before requesting a full-blown fee proposal. Sometimes, design teams are selected solely on the basis of the RFQ, and then fees are negotiated afterwards with the selected team.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Now that you know all the characters, the next step is to find some that you like. This process ordinarily begins with issuing an RFP or a Request for Proposals either publicly or to a list of firms selected by project leadership.\u00a0 Usually you will issue a separate RFP and selection process for each member [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[77,75,10],"tags":[],"class_list":["post-742","post","type-post","status-publish","format-standard","hentry","category-assembling-a-team","category-design","category-new-con"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/742","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=742"}],"version-history":[{"count":11,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/742\/revisions"}],"predecessor-version":[{"id":2506,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/742\/revisions\/2506"}],"wp:attachment":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=742"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=742"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=742"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}