{"id":828,"date":"2013-01-09T02:09:41","date_gmt":"2013-01-09T07:09:41","guid":{"rendered":"https:\/\/www.artsbuildontario.ca\/pibi\/2013\/01\/09\/construction-documents-3\/"},"modified":"2017-04-21T14:43:19","modified_gmt":"2017-04-21T18:43:19","slug":"construction-documents-3","status":"publish","type":"post","link":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=828","title":{"rendered":"Construction Documents (CD)"},"content":{"rendered":"<h2>CDs are for documenting the design<\/h2>\n<p>Once the owner and the architect are satisfied with the plans (and the cost), Construction Documents can begin.\u00a0 In this phase, <b>no further design changes<\/b> are (hopefully) required, and the whole design team focuses on producing a set of plans and specs describing <b>all the details required to build the project<\/b>, from the structural and mechanical systems down to the finish materials and fixtures \u2013 these are the \u2018construction documents.\u2019<\/p>\n<p>In projects pursuing <b>green-building certification<\/b>, there will also be a set of design documentation related to the certification protocol\u2019s requirements.\u00a0 Usually, documentation is submitted once at the end of the design phase, and then again when construction is complete to confirm compliance with the certification protocols.<\/p>\n<h2>FF&amp;E and Owner-Purchased items<\/h2>\n<p>During CDs and into construction you will also work on selecting and sourcing the <b>furnishings, fixtures, and equipment<\/b> that will go into the building \u2013 often referred to as FF&amp;E. This includes furniture, IT equipment, some stage equipment, gallery or museum fittings, etc., and it is often purchased directly by the owner outside the construction contract.<\/p>\n<p>This method of purchase saves you the contractor\u2019s markup cost, but any equipment requiring coordination with construction trades for installation should remain in the base contract and be purchased through the contractor (e.g. theatre seating, hard-wired decorative lighting, museum casework, commercial kitchen equipment, or anything that is \u2018attached\u2019 to the building).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>CDs are for documenting the design Once the owner and the architect are satisfied with the plans (and the cost), Construction Documents can begin.\u00a0 In this phase, no further design changes are (hopefully) required, and the whole design team focuses on producing a set of plans and specs describing all the details required to build [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[112,113,7],"tags":[],"class_list":["post-828","post","type-post","status-publish","format-standard","hentry","category-design-renovations","category-phases-of-design-phase-3-design-renovations","category-renovations"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=828"}],"version-history":[{"count":7,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/828\/revisions"}],"predecessor-version":[{"id":2019,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/828\/revisions\/2019"}],"wp:attachment":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}