{"id":841,"date":"2013-01-07T01:13:06","date_gmt":"2013-01-07T06:13:06","guid":{"rendered":"https:\/\/www.artsbuildontario.ca\/pibi\/2013\/01\/07\/cm-at-risk-2\/"},"modified":"2017-04-21T14:43:21","modified_gmt":"2017-04-21T18:43:21","slug":"cm-at-risk-2","status":"publish","type":"post","link":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=841","title":{"rendered":"CM-At Risk"},"content":{"rendered":"<p>In Construction Management At-Risk project delivery, a GC\/CM is selected on the basis of his\/her <b>qualifications<\/b> (not on the basis of the lowest bid, as in Design-Bid-Build) is invited to join the latter part of the design process.\u00a0 The GC\/CM offers constructability, cost, and scheduling advice as the design is finished, and often guarantees the completion of the project for a guaranteed maximum <b>price negotiated before design is 100% complete <\/b>(GMP). Hence, the GC\/CM is \u2018at risk\u2019 if the project cannot be completed for less than the GMP.<\/p>\n<p>This setup means <b>construction can begin<\/b> prior to the completion of each element of the design, and that the design may not need to be documented as specifically as in a Design-Bid-Build contract.\u00a0 The GMP also allows you to continue fundraising with a guaranteed total cost, and can simplify billing and accounting.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In Construction Management At-Risk project delivery, a GC\/CM is selected on the basis of his\/her qualifications (not on the basis of the lowest bid, as in Design-Bid-Build) is invited to join the latter part of the design process.\u00a0 The GC\/CM offers constructability, cost, and scheduling advice as the design is finished, and often guarantees the [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8,89,92],"tags":[],"class_list":["post-841","post","type-post","status-publish","format-standard","hentry","category-additions","category-phase-3-design","category-project-delivery-methods-phase-3-design"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=841"}],"version-history":[{"count":5,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/841\/revisions"}],"predecessor-version":[{"id":1590,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/841\/revisions\/1590"}],"wp:attachment":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}