{"id":845,"date":"2013-01-05T01:14:27","date_gmt":"2013-01-05T06:14:27","guid":{"rendered":"https:\/\/www.artsbuildontario.ca\/pibi\/2013\/01\/05\/effects-on-operations-3\/"},"modified":"2017-04-21T14:43:22","modified_gmt":"2017-04-21T18:43:22","slug":"effects-on-operations-3","status":"publish","type":"post","link":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=845","title":{"rendered":"Effects on Operations"},"content":{"rendered":"<p>If your renovation will occur in or around your existing facilities, it will likely have an effect on your day-to-day operations.\u00a0 Using the construction schedule as a guide, but understanding that it is likely to change (and get longer), map out what may be required to let you continue operations smoothly.<\/p>\n<h2>A few questions to ask:<\/h2>\n<ul>\n<li>Will an alteration to entrance pathways need to be implemented for patrons?<\/li>\n<li>Will furniture or equipment need to be moved or stored while construction takes place?<\/li>\n<li>Will project staff need office space on-site?<\/li>\n<li>Do planned artistic events mean construction can\u2019t take place during certain periods?<\/li>\n<\/ul>\n<p>Think about these issues in advance and discuss them with your staff and project team to ensure a smooth transition into the construction period.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>If your renovation will occur in or around your existing facilities, it will likely have an effect on your day-to-day operations.\u00a0 Using the construction schedule as a guide, but understanding that it is likely to change (and get longer), map out what may be required to let you continue operations smoothly. A few questions to [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[115,116,7],"tags":[],"class_list":["post-845","post","type-post","status-publish","format-standard","hentry","category-construction-renovations","category-pre-construction-phase-4-construction-renovations","category-renovations"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/845","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=845"}],"version-history":[{"count":6,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/845\/revisions"}],"predecessor-version":[{"id":1931,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/845\/revisions\/1931"}],"wp:attachment":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=845"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=845"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=845"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}