{"id":851,"date":"2013-01-04T03:16:05","date_gmt":"2013-01-04T08:16:05","guid":{"rendered":"https:\/\/www.artsbuildontario.ca\/pibi\/2013\/01\/04\/moving-in-2\/"},"modified":"2017-04-21T14:43:22","modified_gmt":"2017-04-21T18:43:22","slug":"moving-in-2","status":"publish","type":"post","link":"https:\/\/www.artsbuildontario.ca\/pibi\/?p=851","title":{"rendered":"Moving In"},"content":{"rendered":"<h2>Planning for the moving-in period should commence several months in advance.<\/h2>\n<p><b>New staff<\/b> may need to be hired and trained in enough time to hit the ground running prior to opening.\u00a0 <b>Existing personnel<\/b> &#8211; as well as existing files, furniture, artwork, etc. &#8211; will need to plan to move to new quarters if required, and staff should be involved in training and orientation in the new facility.\u00a0 Consideration should be given to <b>orienting audiences and visitors<\/b> as well, even if the project is on a familiar site. Towards the end of construction, your communication with staff and stakeholders should ramp up to begin to include this new information.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Planning for the moving-in period should commence several months in advance. New staff may need to be hired and trained in enough time to hit the ground running prior to opening.\u00a0 Existing personnel &#8211; as well as existing files, furniture, artwork, etc. &#8211; will need to plan to move to new quarters if required, and [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8,93,95],"tags":[],"class_list":["post-851","post","type-post","status-publish","format-standard","hentry","category-additions","category-construction-additions","category-construction-phase-4-construction-additions"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/851","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=851"}],"version-history":[{"count":6,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/851\/revisions"}],"predecessor-version":[{"id":1828,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=\/wp\/v2\/posts\/851\/revisions\/1828"}],"wp:attachment":[{"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.artsbuildontario.ca\/pibi\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}